Projects / Green Futures

Community Plastics Recycling and Manufacturing Plant

The long-term destination of Green Futures: a compliant plant converting recovered plastic into fence poles, benches, wall cladding and boards, creating local jobs. Not yet approved or built.

Illustrative concept of recycled-plastic fence poles and a bench, labelled as not yet an IFFE prototype

Project overview

The long-term destination of Green Futures: a compliant plant converting recovered plastic into fence poles, benches, wall cladding and boards, creating local jobs. Not yet approved or built.

Background

Set out in the Green Futures concept note and 36-month roadmap (September 2026). The plant proceeds only through six stage gates, so that supply, demand, safety and governance are proven before any machinery is bought.

Problem being addressed

Recovered plastic has little local value without processing, and Iganga lacks the manufacturing jobs that could turn it into useful products.

Objectives

  • Prove feedstock supply and customer demand
  • Select a safe, suitable technology and product mix through feasibility studies
  • Secure every environmental, planning, workplace-safety and product-standard approval
  • Create safe, fairly paid adult jobs and supplier income
  • Run with earned-income discipline and a maintenance reserve

Activities

  • Feedstock study: polymer types, tonnes per month, contamination, prices, collection radius
  • Market study: buyers, competing products, willingness to pay
  • Technical and site feasibility, environmental review and five-year financial model
  • Prototype testing for strength, weathering and finish with a technical partner
  • Staged funding: feasibility, then approvals and equipment, then commissioning

Stage gates

  1. Stage 1: Evidence
    Gate: verified baseline and partner letters (in progress)
  2. Stage 2: Feasibility
    Gate: Board-approved feasibility report
  3. Stage 3: Prototype
    Gate: test reports, costed prototypes, purchase interest
  4. Stage 4: Capital
    Gate: investment-grade proposal and due diligence file
  5. Stage 5: Build
    Gate: licensed and commissioned facility
  6. Stage 6: Scale
    Gate: audited performance and reinvestment plan

Target products

ProductPotential marketValidation before sale
Fence polesFarms, institutions, property ownersStrength, dimensions, fastening, weathering, installation
BenchesSchools, churches, parks, businesses, homesLoad capacity, stability, finish, outdoor durability
Wall claddingResidential, commercial, institutional projectsFire behaviour, weathering, fixing, dimensional stability
Boards and profilesFabricators, furniture makers, buildersMachinability, consistency, approved end uses

Products will be sold only after testing and the certification route advised by UNBS.

Impact indicators

IndicatorBaselineTargetActual
Households, students and adults reached[Baseline][Target][To be reported]
Tonnes of plastic by type sourced, rejected and traceably transferred[Baseline][Target][To be reported]
Clean-ups completed and sites maintained after three months[Baseline][Target][To be reported]
Prototype and production units passing quality checks[Baseline][Target][To be reported]
Adults trained, jobs created, supplier income, worker safety[Baseline][Target][To be reported]
Sales, margin and production cost (plant stage)[Baseline][Target][To be reported]

Project updates

[Updates will be posted once implementation begins]

Photo gallery

Related stories

[Consented stories to be added]

Newsletter

Stay close to the families we serve

News, impact updates and ways to help, quarterly. No appeals built around individual children. Unsubscribe any time.

I'm interested in